District heating and district cooling at Munich airport
Munich Airport Franz Josef Strauss
Extension of the supply station ("Versorgungszentrale")
Planning and realisation period: 1999 - 2003
Project size: 13.000.000 €
Munich Airport Franz Josef Strauss
Provisioning of district heating, cooling and gas for Terminal 2 and luggage sorting facility
Planning and realisation period: 1999 - 2003
Project size: 6.900.000 €
Munich Airport Franz Josef Strauss
Construction of a temporary district cooling station (TKZ) for Terminal 2 and luggage sorting facility
Planning and realisation period: 2001 - 2003
Project size: 2.700.000 €
Munich airport Franz Josef Strauss
Creation of the "Energy concept 2020" (Energiekonzept 2020)
Editing period: 2000 - 2001
Munich Airport Franz Josef Strauss
Hydraulic integration of a Single Effect Double Lift (SEDL) absorption refrigerator into the airport's supply station ("Versorgungszentrale")
Planning and realisation period: 1996 - 1997
Munich airport Franz Josef Strauss
Participation in creation of the study "Energy concept for Munich Airport - FJS"
Editing period: 1996
Munich Airport Franz Josef Strauss
Provisioning of district heating, cooling and gas, transfer stations
Planning and realisation period: 1987 - 1993
Project size: 22.500.000 €
Munich Airport Franz Josef Strauss
Centralized generation of district heating / cooling in the supply station ("Versorgungszentrale")
Planning and realisation period: 1987 - 1993
Project size: 9.000.000 €
Do you like this page? Set a bookmark!
|
|
|
|
|
|
|
|
|
|
|
© 2003-2010
Roegelein+Partner Ingenieure GbR, consulting engineers for supply engineering, Munich
Imprint
,
Disclaimer and copyright
|
All rights reserved.
engineer,planning,consulting,supply engineering,building facility,building facilities,industrial engineering